Sending trade fair materials – stand, furniture and equipment on time to the hall

You send trade fair materials strictly to one single deadline – the build-up slot: the core factor is delivery to the exhibition hall within the booked time window, including access regulations and check-in; outbound and return transport run as a package.

Packed project cargo on a low-loader

In exhibition stand building one single deadline counts: the build-up slot. If the stand construction is not at the hall in time, fitters wait and the stand approval is at risk. Speed Logistics transports trade fair materials as direct transport with a guaranteed time window – stand elements, trusses and floor systems, furniture, exhibition technology, lighting and tool cases – from the warehouse of the stand builder or exhibitor straight to the exhibition hall.

After the fair we collect the material again in the dismantling slot and bring it back to the warehouse or on to the next event. You receive the fixed-price offer for outbound and return transport within a few hours.

Delivery to the exhibition grounds: slots, access, logistics rules

Exhibition venues such as Berlin, Frankfurt, Hannover, Munich, Cologne or Düsseldorf work with access regulations, check-in zones and booked time windows for build-up. Our dispatch team knows these processes and plans for them: slot booking or coordination with your stand builder, hall and stand number on the papers, driver with loading documents at check-in, buffers for waiting times at the unloading zone. The driver notifies before arrival so that your build-up team can take receipt at the hall.

What we transport for stand builders and exhibitors

  • Complete modular stand construction: walls, trusses, floors, lighting in one load
  • Furniture and fit-out: counters, seating groups, display cases, kitchen technology
  • Media technology: displays, LED walls, sound and lighting equipment in cases
  • Tool and consumable material for the build-up team
  • Multi-stop tours: first the stand builder's warehouse, then the graphics printer, then the hall

From the Sprinter for follow-up deliveries ('the forgotten case') to the articulated lorry for the large stand, we assign the right vehicle size – with a tail lift too, if no forklift is available at the hall.

Outbound and return transport as a package

Trade fair material almost always travels twice: out for build-up, back after dismantling. We plan both journeys as a package – with interim storage of the empties by agreement and collection exactly in the dismantling slot, when the halls have to be cleared. For trade fair tours we time the onward journey to the next event, so the stand moves from hall to hall without a detour via the warehouse.

Overseas fairs and the ATA Carnet

For fairs outside the EU – for example in Türkiye, the Gulf states or North Africa – Speed Logistics handles the complete customs clearance. Stand construction and equipment for temporary use travel with an ATA Carnet, which secures re-importation without customs duties; consumables and give-aways are declared separately. Costs depend on volume, lane, slot binding and return – depending on lead time you receive a binding fixed price for the whole package.

How much lead time does a trade fair transport need?

For German exhibition venues, two to three working days' lead time is often enough with secured vehicle availability; for European destinations you should allow a week – especially in the peak phases of the fair season in spring and autumn, when slots at the halls become scarce. For overseas fairs with Carnet clearance, add time for the customs documents. Our advice from practice: commission the transport as soon as your build-up slot is confirmed, and report changes to us immediately – the dispatch team adjusts loading time and route. And if things do get urgent, the express run remains: the 24/7 dispatch team schedules at short notice, at the weekend before the fair starts too.

Frequently asked questions: Trade Fair Materials

How does Speed Logistics ensure the material is at the hall for the build-up slot?

The dispatch team plans the journey backwards from the booked build-up slot: access rules and check-in of the exhibition grounds are taken into account, waiting-time buffers are planned and the driver notifies before arrival. Via GPS tracking it is always visible where the load is. If the approach is delayed, the dispatch team immediately informs your build-up team with a new arrival time.

Does Speed Logistics also handle the return collection after the fair?

Yes. Outbound and return transport are planned as a package: collection exactly in the dismantling slot, return to the warehouse or direct onward journey to the next event. Interim storage of the empties during the fair period is possible by agreement. This way the material is ready in time for the next event or in the warehouse.

What is an ATA Carnet and when do I need it for trade fair material?

The ATA Carnet is a customs document for temporary export: with it, stands and equipment can be imported into and re-exported from non-EU countries duty-free. For fairs in Türkiye or the Gulf states, for example, Speed Logistics handles the transport including Carnet clearance. Consumables and give-aways are declared separately for regular clearance.

Can a forgotten case still be delivered during build-up?

Yes. For follow-up deliveries we schedule a Sprinter at short notice as an express run straight to the hall – the dispatch team is available around the clock. Hall, stand number and the build-up team's contact are enough; the driver handles check-in at the grounds. Just give us the fair, hall and stand number by phone.

Which vehicle sizes are common for trade fair materials?

Small shipments and technology cases travel in the Sprinter, medium stands in the 7.5- or 12-tonne truck with tail lift, complete large stands in the articulated lorry. We choose the vehicle by volume, weight and the unloading conditions at the exhibition hall. For large projects we combine several vehicles into a timed delivery.

Does Speed Logistics run multi-stop tours, e.g. warehouse plus printer plus fair?

Yes. We combine several loading points in one tour – such as stand construction at the stand builder, graphics at the printer and furniture at the exhibitor – and deliver everything bundled to the stand. This saves separate shipments and reduces the risk of missing parts during build-up.

Common mistakes when sending trade fair materials – what should I watch out for?

Lead time is underestimated in the fair season – in spring and autumn slots at the halls are scarce – and the hall and stand number are missing from the papers, so the driver can't get through at check-in. For overseas fairs, add time for Carnet documents. Commission the transport as soon as the build-up slot is confirmed, and report changes immediately; the dispatch team adjusts loading time and route.

Why are outbound and return transport planned as a package?

Trade fair material almost always travels twice: out for build-up, back after dismantling. Planned as a package, the empties are stored in the interim by agreement and the return collection takes place exactly in the dismantling slot, when the halls have to be cleared. For trade fair tours the stand moves from hall to hall without a detour via the warehouse – with one contact for all deadlines.